Friday, July 8, 2016

Rock Slide Briefly Closes the Cumbres & Toltec Scenic, Service Resumes Next Day



Some trouble on July 4th kept the morning run from Antonito, CO from reaching Osier that noon for the traditional lunch stop, but that's life in the Rockies, it would seem. A rock slide occurred near Rock Tunnel, one of only two tunnels ever made for the narrow gauge Denver & Rio Grande Western.

As you can see, this is the west side of Rock Tunnel by the top of the Garfield Monument in the left center background. Photo CATS RR

From the west looking back towards the tunnel mouth. Even though there's only 3 feet between the rails, that doesn't make the rocks any less massive or difficult to move! Photo: CATS RR

Obviously, this was not just a bit of granite that they could just kick aside! Extra effort by work crews made sure that the slide would not interfere with the next pair of trains the following day, and the Cumbres & Toltec Scenic let everyone know that they are back in full operation with its press release below.
ANTONITO, CO   JULY 5, 2016    All routes on the Cumbres & Toltec Scenic Railroad (C&TSR) are once again open as of the morning of July 5, 2016, following a rock slide that temporarily closed the railroad between Antonito and Osier Station on July 4.   “We apologize to all riders who were not able to enjoy the complete line on July 4, but these things happen when you run the most authentic steam railroad in the nation,” said John Bush, C&TSR president.

 Jointly owned by the states of Colorado and New Mexico, the Cumbres & Toltec is the highest and longest steam railroad in North America, running 64 miles from Antonito, CO to Chama, NM, crossing state borders 11 times. The rock slide which sent several large boulders down on to the tracks occurred sometime before 10 a.m. on July 4, 2016 near Rock Tunnel.  The slide prevented the train departing from Antonito to make it to the Osier Station for lunch.  That train was able to turn around at Toltec siding and return back to the Antonito Depot.  The train departing from Chama was able to get through to Osier for lunch, and passengers were then returned to Chama.  No one was injured in the incident and crews were able to work throughout the day to clear the huge boulders from the tracks.  All trains and routes were in full operation as of 9:15 a.m. on July 5, 2016.
 The C&TSR was built in 1880 and climbs to Cumbres Pass at 10,005 feet elevation and chugs through Toltec Gorge, 800 feet above the river below.   “When you offer Rocky Mountain scenery such as we do, sometimes Mother Nature plays a role.  We apologize to any passengers who were disappointed with shortened runs on July 4th,” Bush said.
The Cumbres & Toltec Scenic Railroad runs America's longest narrow gauge passenger trains over 64 miles of well-maintained--and usually rock-free--rails that pierce two tunnels and crest the summit of 10,022 foot Cumbres Pass.

Tickets are still available for runs over the high country the rest of the season of 2016 by visiting their site or by calling 1-888-CUMBRES / 888-286-2737.⚒

Thursday, June 16, 2016

Rio Grande 491 Struts Her Stuff Around Her New Home

A little bird (not Twitter) whispered in my ear that the restoration of 491 by the Colorado Railroad Museum has got someone's attention down in Durango. Could be that the museum will be doing some work on another K-37 Mikado very, very soon.

I hope so. I hope they run her as well as her sister, too. What day is today? Thursday. Would you believe that contributing photographer found her pulling a load of passengers in a gondola? To my delight and our mutual pleasure, it was too good for John to pass up!



All three photos: John Hill
Get on down there this weekend for Father's Day. Tell them it would make you happy to see your kids in the caboose! Well, it would. Wouldn't it?⚒

Wednesday, May 25, 2016

Colorado Legislature Shows Support For Reviving the Ski Train

Last month, the Colorado State Legislature, in what could be termed a show of support for the growing interest in resuming the Ski Train, put forward a grant to build a platform for service, aimed at resolving Amtrak's objection for direct service to the slopes of Winter Park.

Amtrak? Not that Amtrak?

Yes, that Amtrak, although there has been nothing to indicate that Amtrak has the initiative to begin its service or when. If and when it does, it could be a partnership between Amtrak and the state as in North Carolina, Maine, or California.

Whatever form a revival will take, it probably won't be like the old Ski Train, because the old Ski Train lost money. The new service, if it comes at all, will likely not run all season, and it will likely be a tighter fit for those riding in coach. Will it be better than running the gauntlet that is I-70 in winter? Oh yeah! But I guarantee it will be different (and likely more expensive) than the old way under Ansco. Amtrak and Winter Park are likely to have differing ideas about rail service to Winter Park, especially in terms of dates and times of service. Hopefully, riders will have more options than under the old system, and service will run frequently and fast.

Ski Train Rio Grande Denver to Winter Park in winter and summer
How many years did the Ski Train run both summer and winter? The glory of summer day trips to Winter Park to escape the heat of the city made the summer runs a special treat for residents of the Mile High City. Artwork: SkiTrain.com




In the video above, Walt Loevy gives us a brief show of a Ski Train in its final 2009 season. There is nothing like the unmistakable sound of an EMD F40 whipping by! Watching it, I can't help but remember another Rio Grande train, the Rio Grande Zephyr, with a similarly painted EMD F9 on the point and single level cars whipping by. I think Ansco did that on purpose. ;)

Here's one last video, click for a look at what the coach service was like in summer 2007.⚒